From: route@monster.com
Sent: Saturday, April 16, 2016 2:05 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
JUAN E. BARTON 6408 Clear Pool
Dr., Arlington TX. 817-797-0820 juanbarton@hotmail.com OBJECTIVE: Maintenance and repair of
telecommunications equipment for wireless communication systems. TRAINING: · Metro Cell
Operations and Maintenance, Nortel Networks, 2003 · Certified Nokia BTS
Installer · Nokia UMTS BTS
Training, 2008 · Ericsson LTE
Training, 2010 · Certification in
Supplier Awareness-Network Space, 2011 · Certification in
Best Practices: Methods of Procedure, 2011 · Certification in
Ask Yourself, 2011 · Nokia Siemens
Networks Flexi LTE BTS Commissioning and Integration
4G-LTE-Multiradio-002-FLSUSBC-USA Certification, 2013 PROFESSIONAL EXPERIENCE: September 2012-Oct 2013 Nokia Siemens Networks/T Mobile
Modernization Field Manager St. Louis, Phoenix, Houston Construction Manager-my primary
responsibilities included quality inspections, ensuring telecommunication
representation is present at sites under construction by GC’s, cutover
coordination, material distribution and related functions supporting LTE/UMTS REFERENCES ON REQUEST AT&T/Ericsson/Orin Cutover, Identify circuit ID at the
NIU. Troubleshooting T1 problems; Troubleshoot the DSX panel, wire
wrapped DSX panel for T1 circuits in the field, worked with RF and diplexers,
identify VSWR problems March 2010- July 2011 Amatel/Ericsson/Orin Installation of Ericsson LTE & UMTS
equipment used in voice, video, fiber optics and data telecommunications
networks. Also experienced in installation OBIF 3C,4C. AC
electrical cables and DC power cables. Experienced in running RF
jumpers and sweeping jumpers. Other skills include the ablility to
complete RBS Installation Quality Checklist. October 2009-January 2010 Mycom/Orin Seattle, WA T-1 Testing, install, terminate, dress and
label cat 3/5/5e/6 cable, terminate jacks, 66/110 blocks and patch panels,
knowledge of commonly used concepts, practices and procedures, installation
of the NIU Box and the junction box with the 66 or 110 block, terminate and
punch down March 2008-October 2009 Ericsson Dallas, TX Responsible for installation, repair, and
maintenance of cell site equipment, troubleshooting, sweeping antennas, T-1
testing, handoff testing, 911 compliance testing, and cell site acceptance to
include utilization of Traffic Manager and Mode Manager software to monitor
time slots. Other responsibilities included commissioning sites and site
audits. Required ability to use remote access feature to complete job
task. Temporary assignment. May 2007-Jan 2008 Nokia/EXI, Baltimore, MD Washington D.C Installed Nokia equipment.
Integration and commissioning, complex ad, sectorization ad, complex ad,
radio migration, complex swaps, sectorization swap, BiasT installs. January 2007-April 2007 Nokia/TNS, St. Louis, MO Field Technician Nokia BTS Commissioning and Integration,
Install BTS and IBBU 48v and 24v cabinets. Complex expansion and simple
upgrade. Adding radio and wideb and combiner and other
components. Completed training with MCPA work and E911 in the St. Louis
market. Deinstalled Nortel equipment. August 2006-December 2006
Nokia/EXI, Phoenix, AZ
Field Technician
Integration and commissioning, complex ad,
sectorization ad, complex ad, radio migration, complex swaps, sectorization
swap, BiasT installs. January 2005-July 2005
Cingular/Unlimited Lynx, New York, New York
Field Technician
Integration and commissioning, complex ad,
sectorization ad, complex ad, radio migration, complex swaps, sectorizaition
swap, BiasT installs. June 2004 – October 2004 AT&T Wireless / MLC Wireless, Patterson, New
Jersey Field Technician
Nokia BTS Commissioning and Integration.
Install BTS and IBBU 48v and 24v cabinets. Complex expansion and simple
upgrade. Adding radio and wideband combiner and other components. Completed
training with MCPA work and E911 in the New York market. January 2004–May 2004 AT&T Wireless / Data Work Force, Somerville, New
Jersey Nokia BTS Installer I Installation of IBBU cabinets and also 24V
cabinets, Assisted analysis and repair of Cellular Base Station equipment of
Nokia Ultrasite BTS. Assist other team members with drive testing, FXC
software upgrades, training for commissioning and Integration. Ability
to work under stressful environments. Provided a daily activity log for
delivery and BTS parts. Performed various task such as grounding, jumper
repair, complex expansion and simple upgrades. Experience using Hub Manager,
and Traffic Manager June 2003-December
2003
T-Mobile Communication/Glotel, Chicago, Illinois Nokia BTS Installer I Installation of the Nokia BTS Ultrasite in
the Midwest, provided customer support. Building coaxial jumper and grounding
cable. Performed sweeps on rx and tx lines using the Anritsu. Responsible for
team daily activity log and equipment and part check out. Assisted the RF
Team in drive testing, and provided accurate CAD drawings of existing
equipment May 2002- April
2003 Cingular Wireless /
FGG Consultant Group, Charlotte, North Carolina Field Engineer Responsible for installation, repair, and
maintenance of cell site equipment, troubleshooting, sweeping antennas, T-1
testing, handoff testing, 911 compliance testing, and cell site acceptance to
include utilization of Traffic Manager and Mode Manager software to monitor
time slots. Other responsibilities included commissioning sites and site
audits. Required ability to use remote access feature to complete job
task. Temporary assignment. |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|